Information about the happenings of Catholic University, South Campus and surrounding area ie. Ward 5 and DC
Showing posts with label Construction Pics. Show all posts
Showing posts with label Construction Pics. Show all posts
Wednesday, July 27, 2011
07/27/2011 - Utility Work on Monroe St between 7th and 8th Streets
Sidewalk is closed on Monroe between 7th and 8th St NE. Will not be able to park on street due to utility survey work.
Friday, July 8, 2011
7th ST and Monroe Sidewalk Closed Today - 07/08/2011
Street and Sidewalk activity on 7th and Monroe Street all day today. 7th St and Monroe Sidewalk is currently closed. Please take care when travelling towards Monroe and Michigan.
Thursday, March 17, 2011
EICCI Creates Community Message Board for South Campus Residents
Economic International Construction Corporation, INC responded to SMD 5C10 request for a demolition plan by posting Spellman, Spalding and Conaty Demolition Plan on a message board posted on the 3300 block of 7th St NE. The message board will be updated biweekly.
Initial text include:
720 S. Caton Avenue Baltimore , MD 21229
Initial text include:
Spellman, Spalding, and Conaty Demolition Plan
All communications from the neighborhood will come through and be directed to Economic International Construction Company, Inc. Attention – Damon Roundtree 410-327-9105
Deliveries will turn off Monroe , down 7th, then into the site to avoid riding thru the residential portion of 7th St .
Work will begin at 7pm and end by 4pm, Monday thru Saturday
The DC Inspectors visit the project on a regular basis to insure we are in compliance with the demolition and sediment controls guidelines.
This is our 2 week look ahead you requested dates are from 2-24-11 until 3-10-11
Mass demolition with the crane and wrecking ball complete during this time frame. Spellman building will be processed and ready for crushing within these time frames. All metal from Spellman will be loaded out to a recycling venue.
Schedule will be updated every 2 weeks.
Our subcontractor, Berg is responsible for keeping the entrance and 7th street clear and clean during the demo work.
All construction personnel and equipment will be parked within the LOD. There is plenty of space in the rear of the site.
Source:
Damon Roundtree
Economic International, Construction Co., INC
Phone: 410.327.9105
www.eicci.com
Thursday, March 3, 2011
CUA South Campus Construction Pics - Spellman Hall Dormitory on 7th ST NE. 03.02.2011
Wednesday, March 2, 2011
CUA South Campus Construction Pics - Fuel Runoff from Construction site on to 7th ST NE. 02.28.2011
A concerned neighbor took these pictures displaying that the fuel from the construction site was polluting the water travelling to the storm drain on 7th Street. Pictures are taken within the 3200 block of 7th Street NE.
EICCI was sent copies of the pictures. We have asked EICCI and BERG to execute a prevention plan.
Wednesday, February 16, 2011
CUA South Campus Construction Pics - Spellman Hall Dormitory on 7th ST NE. 02.16.2011
Spellman Hall Dormitory - Catholic University of America, South Campus
Taken from 7th and Lawrence on 02.16.2011
Complaints about the travelling dust from the construction site were addressed to EICCI Development at eicci0@hotmail.com this morning. A recommendation to use a water solution to reduce dust travel was presented and requested to be executed immediately.
Taken from 7th and Lawrence on 02.16.2011
Complaints about the travelling dust from the construction site were addressed to EICCI Development at eicci0@hotmail.com this morning. A recommendation to use a water solution to reduce dust travel was presented and requested to be executed immediately.
Tuesday, February 15, 2011
CUA South Campus Construction Pics - Spellman Hall Dormitory on 7th ST NE. 02.15.2011
Spellman Hall Dormitory - Catholic University of America, South Campus
Taken from 7th and Lawrence on 02.15.2011
Taken from 7th and Lawrence on 02.15.2011
Subscribe to:
Posts (Atom)



